Fire protection when finishing an opening

The new structure and altered separating elements must meet the building’s requirements. Discuss protective systems and junctions before finishing.

Draagmuur Gigant · Updated 24 September 2026

Different functions

Protecting steel and maintaining a fire-separating wall or floor serve different purposes. Required performance must be assessed for the actual building.

The complete system matters

Boards, fixings, joints, coatings and connections work together. Follow the documented application of the selected system. An extra coat of paint is not proof of fire performance. Coordinate sealing around new pipes and cables and keep relevant product and installation records.

Your checklist

  • Establish required performance
  • Coordinate junctions and penetrations
  • Keep product records
Sources and further reading

Omgevingsloket · IPLO

General information about projects in the Netherlands. Your building requires its own assessment and design.

Ready for more space?

Tell us what you want to change. We will discuss the opening, preparation and a suitable quotation.

Discuss your plans
Call usRequest a quotation