Load-bearing wall removal across the NetherlandsQuestions? 06 4012 5121
Draagmuur Gigant
Menu

Coordinating fire-protective cladding

Where the structure needs fire protection, that protection belongs in the design and installation. Coordinate the finish with the relevant specialists.

From preparation to completion

Required performance depends on the building and component. Not every board, paint or arbitrary thickness provides the same protection. Select a supported system and account for connections, joints and penetrations. Product instructions and the project design govern its application. Record the relevant product and handover information. Profile shape, access and the specified performance influence cost.

What we coordinate with you

  • Establish required performance
  • Choose a suitable documented system
  • Detail joints and penetrations
  • Keep product and completion records

What affects the price?

Loads, span, support, access and finishes determine the work. A price for steel alone is not a price for the complete opening. Share your drawings and desired result so the quotation can identify included work, provisional items and exclusions.

Costs →

Questions about this service

Is ordinary plasterboard always enough?

No such assumption is justified. The complete system and its correct application determine the achieved performance.

Sources and further reading

Omgevingsloket · IPLO

General information about projects in the Netherlands. Your building requires its own assessment and design.

Your project in the area

Ready for more space?

Tell us what you want to change. We will discuss the opening, preparation and a suitable quotation.

Discuss your plans
Call usRequest a quotation