From preparation to completion
Removing a wall may reveal missing floor finishes, old wall outlines and level differences. A consistent result can therefore require work beyond the opening itself. Discuss exposed steel or cladding and identify who handles plastering, painting and flooring. Drying periods may affect the sequence. The area to repair and availability of matching materials influence the price.
What we coordinate with you
- Agree on the final appearance
- Detail beam and column cladding
- Review junctions with existing finishes
- Coordinate follow-on work and handover
What affects the price?
Loads, span, support, access and finishes determine the work. A price for steel alone is not a price for the complete opening. Share your drawings and desired result so the quotation can identify included work, provisional items and exclusions.
Costs →Questions about this service
Does ready for painting mean already painted?
No. Describe the agreed result precisely, including surface preparation, painting and floor repairs where applicable.
General information about projects in the Netherlands. Your building requires its own assessment and design.