Why do equally wide openings cost different amounts?

Width alone does not set the price. Loads, existing support, material, access and the desired finish determine the complete scope.

Draagmuur Gigant · Updated 24 September 2026

Above, below and around

A wall or floor above may affect the design. The floor or foundations below the new support also matter. A long access route, upper-floor property or tight workspace may require more labour and equipment.

Compare the finished result

Exposed steel and a fully concealed solution need different finishing work. Restoring continuous floors or ceilings can extend beyond the original wall position. Use the same plans for each quotation and ask for separate identification of design, steel, installation, removal and repairs.

Your checklist

  • Compare complete work packages
  • Share photographs of access
  • Describe the finished result
Sources and further reading

Omgevingsloket · IPLO

General information about projects in the Netherlands. Your building requires its own assessment and design.

Ready for more space?

Tell us what you want to change. We will discuss the opening, preparation and a suitable quotation.

Discuss your plans
Call usRequest a quotation