Preparing steelwork from measurement to installation

Before fabrication, agree on design, dimensions, connections, delivery and finishes. Establish who handles each stage and which documents are final.

Draagmuur Gigant · Updated 24 September 2026

Start with usable space

Describe the finished clear opening and height. Include cladding, columns, adjoining walls and the position of doors or kitchen units. Check that available building documents match reality and keep unresolved information visible.

Coordinate the complete delivery

Specify fabrication drawings, approval of changes, prefabricated assemblies and site work. Include temporary support and coordination with demolition. At handover, review the work against the quotation, record outstanding items and collect final calculations, drawings and product information. Keep the file for future maintenance and alterations.

Your checklist

  • Confirm usable dimensions
  • Use current coordinated drawings
  • Plan delivery, support, finish and handover
Sources and further reading

Omgevingsloket · IPLO

General information about projects in the Netherlands. Your building requires its own assessment and design.

Ready for more space?

Tell us what you want to change. We will discuss the opening, preparation and a suitable quotation.

Discuss your plans
Call usRequest a quotation