From preparation to completion
A temporary support plan considers loads during the work and the structure supporting the props. The sequence and conditions for removing temporary support must be clear. A generic prop spacing or fixed waiting period cannot replace a project-specific assessment. The number of levels, duration and necessary supporting provisions influence planning and cost.
What we coordinate with you
- Assess temporary loading stages
- Include the supporting floors and structure
- Coordinate the work sequence
- Agree on release and removal conditions
What affects the price?
Loads, span, support, access and finishes determine the work. A price for steel alone is not a price for the complete opening. Share your drawings and desired result so the quotation can identify included work, provisional items and exclusions.
Costs →Questions about this service
When can the props be removed?
Only when the structural and execution requirements have been met. Materials and connections affect this; there is no universal waiting period.