From preparation to completion
Dimensions, support positions, connections and assembly sequence must be known before delivery. Temporary support for existing building parts belongs in the preparation where needed. Agree which members are supplied, how they reach the workspace and when inspections and follow-on work occur. Record changes and outstanding items at handover. A structurally completed opening and a fully painted room are different completion levels.
What we coordinate with you
- Coordinate final drawings and components
- Plan access, workspace and equipment
- Detail the temporary condition and installation order
- Record connections, changes and handover
What affects the price?
Loads, span, support, access and finishes determine the work. A price for steel alone is not a price for the complete opening. Share your drawings and desired result so the quotation can identify included work, provisional items and exclusions.
Costs →Questions about this service
Can you install steelwork that has already been supplied?
Share the calculations, final drawings and supplied steel specifications. We discuss whether the components suit the building and what preparation is still needed.