Steelwork for an extension

Connect the existing house and the new extension. The steel design must suit both building parts and the construction sequence.

From preparation to completion

A new extension has its own structure, but the opening also affects the existing house. Coordinate foundations, steel positions, roof and facade junctions. A wide opening without visible masonry may require a different solution from a smaller passage. The engineer assesses how loads transfer between old and new parts. Include temporary closure and repairs to the existing building in the agreements.

What we coordinate with you

  • Coordinate the extension and opening designs
  • Agree beam, columns and supporting structure
  • Plan temporary weather protection
  • Coordinate steel installation with other stages

What affects the price?

Loads, span, support, access and finishes determine the work. A price for steel alone is not a price for the complete opening. Share your drawings and desired result so the quotation can identify included work, provisional items and exclusions.

Costs →

Questions about this service

Can the rear wall go before the extension is finished?

That follows from the execution plan and temporary structural design. Also agree on protection against rain, draughts and unauthorised access.

Sources and further reading

Omgevingsloket · IPLO

General information about projects in the Netherlands. Your building requires its own assessment and design.

Your project in the area

Ready for more space?

Tell us what you want to change. We will discuss the opening, preparation and a suitable quotation.

Discuss your plans
Call usRequest a quotation