From preparation to completion
Before drilling, establish what is in and around the area. Reinforcement, pipes and prestressed components may restrict the location. The installer specifies the required clear opening; the engineer assesses structural acceptability where necessary. Agree on water and slurry collection, access, sealing and reinstatement. Diameter alone does not determine the price: thickness, position, quantities and preparation matter too.
What we coordinate with you
- Record the opening location and purpose
- Check the structure and concealed services
- Plan access and water collection
- Agree on sealing and reinstatement
What affects the price?
Loads, span, support, access and finishes determine the work. A price for steel alone is not a price for the complete opening. Share your drawings and desired result so the quotation can identify included work, provisional items and exclusions.
Costs →Questions about this service
Can an opening be drilled anywhere in a concrete floor?
No. Floor type and structural components may limit the position. Have the chosen location assessed first.