From preparation to completion
Accurate dimensions, connection details and assembly order matter. Agree who designs the structure, reviews fabrication drawings and supplies completion documents. A beam, column or frame must both fit the finished room and reach its installation position. Compare material, fabrication, delivery, equipment, installation and finishes. Changes on site must be assessed before components are altered.
What we coordinate with you
- Coordinate project drawings and details
- Check final dimensions before fabrication
- Plan delivery and installation order
- Record changes and completion documents
What affects the price?
Loads, span, support, access and finishes determine the work. A price for steel alone is not a price for the complete opening. Share your drawings and desired result so the quotation can identify included work, provisional items and exclusions.
Costs →Questions about this service
Can you coordinate with my own structural engineer?
Share the available calculations and drawings. We discuss whether they provide enough detail for supply and installation.
General information about projects in the Netherlands. Your building requires its own assessment and design.